# Change orders and cost overruns: financing questions to ask

Updated: November 19, 2026. Educational guide; financing terms vary by lender and transaction.

Unanticipated costs are inherent in construction. Sponsors must understand how contingency funds work, who bears the risk of overruns, and what documentation lenders require to approve budget changes without halting progress.

## The Reality of Budget Variance

Construction projects rarely proceed exactly as drawn on paper. Material prices fluctuate, site conditions change, and design refinements occur. For a sponsor, these variances create two distinct financial pressures: the immediate need for cash to cover extra expenses and the longer-term risk that the project’s value does not increase enough to justify the higher cost. Lenders view cost overruns through the lens of feasibility. If the final cost exceeds the projected value, the developer’s profit margin disappears, and the loan may become undersecured [S1]. Understanding how your financing documents handle these shifts is critical to maintaining liquidity and avoiding default.

## Contingency Allowances and Their Limits

Most construction budgets include a contingency line item designed to fund unanticipated cost increases. Contingency allowances vary based on the project’s size or complexity but usually range between 5 and 10 percent of the overall budget. Common triggers for using these funds include sudden spikes in material costs or buyer-mandated redesigns. However, contingency funds are not an infinite pool. They are intended for reasonable, unforeseen events, not for poor projections or management errors. If a cost overrun results from poor projections or management, the increased cost is ordinarily covered by the borrower rather than by a draw-down on the loan amount budgeted for contingencies [S1].

Before signing a loan agreement, sponsors should ask how the lender defines eligible contingency uses. Some lenders restrict contingency draws to specific categories, such as hard cost increases, while others allow flexibility for soft cost adjustments. Clarifying these boundaries early prevents disputes during the draw process.

## Hard Costs Versus Soft Costs

Lenders categorize construction expenses into hard and soft costs. Hard costs generally include on- or off-site improvements, building construction, general contractor fees, bonding, and insurance. General conditions costs, which include jobsite management expenses, are also part of this category but are typically funded with each loan advance as the contractor incurs additional project expenses, rather than fully funded upfront [S1].

Soft costs include interest, development fees, predevelopment expenses, and leasing commissions. These items are often scrutinized more closely because they can be manipulated to inflate the project’s total cost. Lenders will verify that costs payable to related parties, such as developer fees, are reasonable compared to third-party market rates. Importantly, interest or preferred returns payable to equity partners or subordinated debt holders should not be included in the construction budget [S1]. When change orders arise, sponsors must determine if the additional expense falls into the hard or soft bucket, as this affects which reserve accounts are available for funding.

## The Role of Completion Guaranties

One of the most significant protections for a lender is the completion guaranty provided by the sponsor. This guarantee asserts that the project will be finished lien-free and that any cost overruns will be paid by the sponsor, not the lender. In many cases, lenders also require a carry guaranty covering interest, taxes, and insurance until the property meets agreed income tests [S2].

When a change order pushes costs beyond the original budget and contingency reserves, the completion guaranty becomes active. The sponsor is personally liable for the excess. Sponsors should ask their lenders whether the guaranty is limited to a specific dollar amount or if it is unlimited. An unlimited guaranty exposes the sponsor’s personal assets to any magnitude of overrun, whereas a capped guaranty provides a defined liability ceiling. Understanding this exposure allows sponsors to plan their equity contributions accordingly.

## Documentation and Change Order Approvals

Lenders require detailed documentation to assess the appropriateness of any budget change. This includes revised line-item budgets, updated plans, and schedules reviewed by qualified individuals such as architects or construction engineers [S1]. The economic purpose of development is to create value greater than the cost; therefore, lenders evaluate whether material changes to the plans reflect in the construction budget and whether sufficient funds remain to complete the project [S1].

Sponsors should establish a clear protocol for change order approvals within the loan agreement. This protocol should define thresholds for minor versus major changes, specify who has the authority to approve each tier, and outline the timeline for lender review. Delays in approval can stall construction and trigger penalty clauses. Additionally, sponsors must ensure that change orders do not introduce costs not stipulated in the loan agreement, such as rebuilding to meet undisclosed specification changes or paying for general corporate overhead [S1].

## Checklist for Sponsor Preparation

To manage change orders effectively, sponsors should prepare the following before breaking ground:

*   Verify that the contingency percentage aligns with the project’s risk profile and local market volatility.
*   Confirm the distinction between hard and soft costs in the budget to anticipate which reserves are accessible for specific overruns.
*   Review the completion guaranty terms to understand personal liability limits for cost overruns.
*   Establish a documented workflow for submitting change orders, including required supporting documents like revised drawings and cost breakdowns.
*   Ensure that the general contractor’s contract includes clear provisions for handling price fluctuations and scope changes.
*   Monitor the interest reserve closely, as extended timelines due to change orders can deplete this fund faster than anticipated.

### FAQs

**Who pays for cost overruns caused by poor project management?**
Cost overruns resulting from poor projections or management are typically the responsibility of the borrower, not the lender. These costs are not covered by contingency allowances meant for unforeseen events [S1].

**Can I use contingency funds to pay for design changes requested by a buyer?**
Yes, common uses of contingency funds include unexpected increases in material costs or buyer-mandated redesigns. However, you must follow the lender’s approval process and document the change thoroughly [S1].

**What happens if the interest reserve runs out during a delay?**
If the interest reserve is depleted due to construction delays or cost overruns, the sponsor is typically required to fund the difference. Lenders often require property income to apply to interest first during lease-up, with the reserve covering any shortfall [S2].

Wraith Real Estate arranges commercial construction loans on behalf of borrowers. We prepare the loan request with the sponsor, including the budget, schedule, and pro forma, and take it to lenders suited to the project’s size, market, and structure. Wraith is not a lender and does not provide underwriting approval. To discuss your financing needs, please share your property details, business plan, required amount, and timing through our financing contact route.

## Sources
[S1] OCC Commercial Real Estate Lending handbook: https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/pub-ch-commercial-real-estate.pdf
[S2] Wraith construction loans: https://www.wraithre.com/debt/construction-loans

Financing inquiry: https://www.wraithre.com/contact?utm_source=wraith_fieldnotes_variant_a&utm_medium=organic&utm_campaign=debt_guides&utm_content=change-orders-and-cost-overruns-financing-questions-to-ask