How to compare an original and revised construction sources-and-uses budget
A practical guide for commercial real estate sponsors to compare original and revised construction budgets, with an evidence checklist to prepare for lender discussions.
A practical guide for commercial real estate sponsors to compare original and revised construction budgets, with an evidence checklist to prepare for lender discussions.
When a construction project changes—whether through a redesign, a material cost shift, or a scope adjustment—the sponsor receives a revised budget. Comparing that revision against the original sources-and-uses budget is a critical step before any lender conversation. This guide explains how to prepare that comparison, what to look for, and how the information affects the financing discussion.
Identify the original and revised sources-and-uses statements
The first task is to locate both versions of the budget. The original sources-and-uses statement is the one the lender approved at closing. The revised version should come from the general contractor or the project manager, ideally with a written explanation of what changed. Lay them side by side. Record the total sources (loan proceeds, sponsor equity, any mezzanine debt or preferred equity) and the total uses (hard costs, soft costs, contingency, interest reserve). Compare the totals. If the revised total is higher, the difference must be covered by additional equity, a larger loan, or a combination. If it is lower, the lender may reduce the loan or release excess contingency. Do not assume the lender will automatically adjust the loan amount; ask the actual lender how they handle a revised total.
Distinguish hard cost changes from soft cost changes
Construction budgets typically categorize costs as hard and soft costs [1]. Hard costs include on- or off-site improvements, building construction costs, general conditions costs, general contractor's fees, bonding, and contractor insurance [1]. Soft costs include legal services, loan interest, supervisory fees, and insurance expenses [1]. Compare each category between the original and revised budgets. Identify which hard cost line items increased or decreased—for example, a rise in material costs or a change in subcontractor pricing. For soft costs, check whether legal, permitting, or financing fees changed. Record the dollar and percentage change for each category. This distinction matters because lenders often treat hard and soft costs differently when sizing the loan or evaluating the contingency.
Reconcile the sources side: equity, loan, and other funds
The sources side of the budget shows where the money comes from. The original sources typically include sponsor equity, the construction loan, and possibly mezzanine debt or preferred equity [2]. In the revised budget, check whether the lender agreed to increase the loan, whether the sponsor must contribute more equity, or whether other sources were added. Record the original and revised amounts for each source. If the loan amount changed, note whether the lender required additional guaranties, such as a completion guaranty or a carry guaranty [2]. If the sponsor's equity increased, confirm that the equity is invested before the first loan draw, as most construction lenders require [2]. Do not assume the lender will approve a loan increase without additional conditions; ask the actual lender.
Check the interest reserve and its adequacy
The budget usually includes an interest reserve funded from loan proceeds, so interest during construction is paid from the loan rather than from the sponsor's own cash [2]. In the revised budget, compare the interest reserve amount. If the construction schedule extended, the interest reserve may need to increase. If the loan amount or interest rate changed, the reserve calculation also changes. Record the original and revised interest reserve amounts, the interest rate assumption used, and the expected construction period. Assess whether the revised reserve is adequate given the construction progress [1]. If the reserve runs short, the sponsor is typically required to fund the difference [2]. This is a suggested way to prepare information; the lender will make the final determination.
Prepare a document: the budget comparison workpaper
Create a simple workpaper that lists each line item from the original and revised budgets side by side. Include columns for original amount, revised amount, dollar change, percentage change, and a notes column for explanations. Add a summary section that totals hard costs, soft costs, contingency, interest reserve, and all sources. At the bottom, write a brief narrative explaining the most significant changes and their causes. This workpaper is not a formal submission; it is a tool for your own preparation and for discussion with the lender. Keep it in a single file, updated as new revisions come in.
Discuss the comparison with the lender
When you present the revised budget, bring the workpaper and the supporting documents: the original approved budget, the revised budget from the contractor, and any written explanation of changes. Explain the reasons for each material change [1]. Be prepared to discuss whether sufficient funds remain in each budget category to complete the project [1]. If the revised budget shows a shortfall, explain how you plan to cover it—through additional equity, a loan increase, or cost reductions. Do not promise outcomes you cannot deliver. The lender will evaluate the revised budget against the project's feasibility, the sponsor's track record, and the property type and market [2].
What is the difference between a rent roll and a T-12, and why does it matter for a construction budget comparison?
A current rent roll is a snapshot of current occupancy and rent. A T-12 is twelve months of historical income and expense data. For a construction budget, the T-12 is not directly relevant because the project is not yet generating income. The budget comparison focuses on costs, not income. If the project includes a lease-up period, the pro forma will use projected income, not historical data.
Does the lender always require a revised budget to be reviewed by a third-party consultant?
Not always, but for complicated projects, lenders often require that plans, schedules, and cost estimates be reviewed by qualified personnel such as an architect, construction engineer, or construction consultant [1]. If the lender engages a consultant, the consultant will verify that the revised budget is reasonable and that work in place supports disbursements to date [1].
Can the sponsor use contingency funds for any cost overrun without lender approval?
No. The contingency account is part of the approved budget, and any use of contingency funds typically requires lender approval. The lender will want to know the reason for the overrun and whether the remaining contingency is adequate [1]. Common uses include unexpected material cost increases or buyer-mandated redesigns [1].
Run the numbers on your deal
See how loan-to-cost and value at completion size a construction loan, how much equity is left to fund, and an estimated interest reserve.
Talk through your financing
Working on a real property? Send us the deal and a financing advisor will review it and get back to you. It costs nothing to ask and does not commit you to anything.
Requests are reviewed by Wraith Real Estate, a commercial real estate debt advisor (not a lender).